- November 24, 2021
- Posted by: PQSadmin_new
- Category: PPAP Documentation
In today’s era in an Automobile/Aerospace Industry, every supplier has to be assessed of his capabilities on the way he carries out his work. He is required to provide proof of how each process functions and its difficulties as documented evidence to its client for verification to ensure long-term business. That’s why the term Production Part Approval Process (PPAP) Document came into existence. Every OEM’s goal is to have a trustworthy/reliable supplier and PPAP enforces that requirement.
Due to its positive results, other industries like defense, consumer goods, medical, electronics have been quick to adopt PPAP.
This in-depth document is like a formal certification/approval by the supplier that quality is being taken the utmost care and any kind of defects is being avoided.
PPAP is important for –
- The OEM’s to validate supplier’s performance based on quality, quantity and its effectiveness under a production process.
- The suppliers, as they would know what are the customers (OEM) requirement and specifications for a product.
- Both the customer and the supplier to maintain a perfect document on all the necessary information on a part which can be referred anytime.
When PPAP is required?
PPAP is mostly required when a change to an existing part or process is being planned or initiated, new parts, etc. Whenever such a change takes place, it is considered a critical activity for an Automobile/Aerospace Industry. To address such change, PPAP is considered a valuable tool for establishing confidence in component suppliers and their production process.
What are the Required PPAP Documents?
Automotive Section
- Design records
- Engineering Change Documents
- Customer Engineering Approval
- Design Failure Mode and Effects Analysis (DFMEA)
- Process Flow Diagrams
- Process Failure Mode and Effects Analysis (PFMEA)
- Control Plan
- Measurement System Analysis (MSA) Studies
- Dimensional Results
- Material Performance Test Results
- Statistical Process Control (SPC)
- Qualified Laboratory Documentation
- Appearance Approval Report (AAR)
- Sample Product (Drawing)
- Master Sample
- Checking Aids
- Records of Compliance with Customer-Specific Requirements
- Part Submission Warrant (PSW)
Aerospace Section
- Released Production Drawings or Definition
- Supplementary Product Requirement Documents
- Production Purchase Order
- Design Failure Mode and Effects Analysis (DFMEA)
- Process Flow Diagram
- Process Failure Mode and Effects Analysis (PFMEA)
- Process Control Plan
- Process Readiness Study
- Initial Process Studies
- Measurement System Analysis
- Engineering Frozen Planning/Engineering Source Approval
- Dimensional Reports
- Functional Testing Approval
- Special Process Approval & NDT
- Material Certification Documentation
- Raw Material Approval
- Part Marking Approval
- Packaging, Preservation and Labelling Approval
- Review and Sign-Off
Note – The requirement for the number of documents can vary as per the OEM needs.
PQSmitra’s PPAP Consulting Services
PPAP being a lengthy and detailed process, each document has its own significance and importance. So for performing at a top-level we have helped clients to effectively go through the required PPAP documents and identify non-conformances.
Our gap analysis has proved to meet compliances with the PPAP requirements and also bring in sustainable changes.